This is a complete rebuild of a previously installed system. We kept the two NTI 250 boilers and the indirect heater tank. Everything else had to be discarded because of a botched installation and flawed design. The boilers power 2 air handlers, radiant basement floor, balcony and porch snow melt through a heat exchanger in addition to domestic hot water. This was another co-operation with gasguys.ca